Structural Rigidity
Corners and Perpendicular intersections of walls are lagged into place using 1/4” lags for additional structural rigidity.
Corners and Perpendicular intersections of walls are lagged into place using 1/4” lags for additional structural rigidity.
Walls are initially placed and fastened with nails before being screwed for a final extra sturdy connection.
A foam strip is inserted between the exterior wall and the floor system to ensure an airtight seal.
Spray foam is used on the exterior side of electrical boxes installed in exterior walls to ensure maximum energy efficiency.
Floor Boots for HVAC sealed to the floor using Shurtape to ensure an air tight seal.
PBS Modular recently completed a contemporary modular apartment building. Sanctuary Apartments consists of 3 stories and 24 units. Residents each have convenient covered parking spaces
A division of Modular Building Systems of PA
© Professional Building Systems, Inc | Designed By Jaspin Interactive LLC | Privacy Policy