The modular building process begins as soon as a builder presents PBS with a concept. Our design team quickly creates a preliminary plan based on the information provided by the builder. That same information is entered into our sophisticated order entry and design system enabling us to design the structure, as well as produce an accurate estimate for the project. After the plans and order are approved by the builder, full detail drawings are produced and stamped by a third party engineering agency (or the local inspection agency in the case of a four story or commercial structure). These plans are then used by the builder to secure a building permit.
Once the building permit has been secured by the builder, the engineering department at PBS will begin the detailed production drawings that are used to construct the modules. Each module is an important part of the structure and will be combined with the other modules at the site to form a complete building.
PLANT 1
pLANT 2
Sanding and painting are next and in the final stages of production, items such custom cabinetry, fixtures, flooring, molding and trim are installed. A final quality assurance inspection is performed to ensure the module is complete. After passing the final inspection the module is wrapped in a durable plastic to protect it against the elements and loaded onto a carrier in preparation for transporting it to the building site.
Modular construction is superior to site-built construction in many ways some of which include; the additional material used in building the structure, a controlled building environment, less waste and damage of materials, a rigid inspection process and the overall speed of the construction.
The building codes and materials used in modular construction are the same or more stringent then in site-built construction. We are confident that the structure produced in the PBS facility is stronger and more energy-efficient than most site-built structures.